Despite mildly temperamental weather, Saturday still turned out to be very successful. We succeeded in ripping off the kitchen portion of our roof and building our new trusses. In actuality we only had to rip off a 5 x 20 ft. section so that we could get the elevation correct on the new trusses. We’re planning on ripping off the rest of the roof from the inside. We also succeeded in sheeting the new roof. This process lasted from 9 a.m. to 9 p.m. It was a very full and tiring day, but we got it done.
We’re still waiting on roof trusses for the 4-season porch. As the porch will have a gable roof line, in an effort to save time, we opted to have a lumber yard build these. They are currently about a week out in fabrication. Hopefully though, we will have them in time for next weekend. Will post new pics soon.
Monday, May 10, 2010
Thursday, May 6, 2010
High Hopes
We have high hopes for a productive weekend. After two so-so weather weekends in a row (first rain, than wind), we’re hoping that this Saturday will be different. Even though the forecast show unseasonably cold weather (high of 55), as long as it doesn’t rain, we are going to commence with removing the roof from the kitchen side of the remodel. We’re still two weeks out on roof trusses for the 4-season porch. We’ll have to get the roof on, the windows installed, and hopefully come Memorial Day weekend, we’ll be tearing out my existing kitchen and ripping down the walls between the old and new space. That will be an exciting day!
Sunday, April 18, 2010
Saturday, April 10, 2010
Tuesday, March 16, 2010
New Laundry Room Picture
Tuesday, March 9, 2010
Finished Floor
We finished installing the laundry room floor last night. For a floating, click-together floor, I must admit it looks pretty good. The space feels very large and spacious, but I suppose this is true of any space that hasn’t yet been packed with junk.
We still have several things to finish up including: touch up paint, installing the trim, painting the sink base and hanging and painting doors. We’ll then have to shop for a countertop. This hasn’t been the most exciting project, but it’s always nice to see spaces change from non-useable to useable.
We still have several things to finish up including: touch up paint, installing the trim, painting the sink base and hanging and painting doors. We’ll then have to shop for a countertop. This hasn’t been the most exciting project, but it’s always nice to see spaces change from non-useable to useable.